The rain window

When each job runs

Paint needs dry boards, a dry day to go on and a dry day or two to set. In Seattle the longest run of those is usually early summer to early fall. The bars show our usual pattern; the forecast decides each day.

  • Estimates and color consults

    All year. We book the next summer's exteriors from winter.

    all year

  • Moss and mildew wash

    On roofs, decks and north walls, before it can dry out for paint.

    Apr-May

  • Siding and sill repairs

    Carpentry and patching, in dry spells and under cover.

    Apr-Oct

  • Exterior painting

    The main season for siding and trim.

    Jun-Sep

  • Porch floors and decks

    Several dry days between coats to cure.

    Jul-Sep

  • Interior painting

    Winter work: rain doesn't matter inside.

    Oct-Mar

  • Built-ins and woodwork

    Slow, careful work that suits short days.

    Nov-Mar

Dates move with the weather. We never promise a calendar date for an exterior.

A rain day

How a rain day works

No one on the crew decides this alone. It's the same rule for every job.

  1. 01

    Step 1: The evening before

    We check the forecast for the next two days and text you what we plan to do.

  2. 02

    Step 2: 6 a.m.

    We check again. If rain is coming before the paint can set, we don't start that wall.

  3. 03

    Step 3: If it rains mid-day

    Wet boards and wet caulk don't get paint. We cover what's open, clear the site and leave.

  4. 04

    Step 4: The next dry day

    We text you the new day. The written scope doesn't change because the weather did.

Your part

What helps us on a dry week

A short list for the week before we start.

  • Move the cars

    Clear the drive and the curb in front, so ladders and scaffold can go where they need to.

  • Turn off sprinklers

    Walls dry slowly if a sprinkler hits them. Turn them off the week before.

  • Tell us about the yard

    Gates, pets, beds you love. We'd rather know than guess.

Questions we get most

What happens if it rains?

We check the forecast the evening before and again at 6 a.m. Wet boards and wet caulk don't get paint. If rain starts mid-day we cover what's open, clear the site and text you the next dry day. Rain moves the schedule; it doesn't change the written scope.

How long does an exterior take?

Most two-story houses take one to two weeks of working days, spread across dry weather. A three-story Victorian with a lot of trim takes longer. We write a range into the estimate, not a promised date, because the forecast sets the calendar.

Can you paint over moss and mildew?

No. We wash it off first, let the wall dry for a few days and then prime. Paint over moss peels, and so does paint over wet wood.